Our longstanding clients Capri Heights engaged us to make some changes to the building facade, plastering the external stairwell walls.
Plastering made to last.
Our well-trained team began with a total treatment of the face bricks with an ABE Dura Slurry to ensure a lasting bond and to prevent delamination. Our plaster mix was impregnated with the ABE Latex to endure durability. Finally, we cut all expansion joints and filled with an ABE backing cord and ABE polyurethane construction sealant.
All plaster was primed before laying down the base and final colours.